Krymsky Bridge

The Crimean Bridge in 2004.

Coordinates: 55°44′02″N 37°35′56″E

Krymsky Bridge or Crimean Bridge (Russian: Крымский мост) is a steel suspension bridge in Moscow. The bridge spans the Moskva River 1,800 metres south-west from the

Kremlin and carries the Garden Ring across the river. The bridge links the Crimean Square to the north with Krymsky Val street to the south. The nearby Moscow Metro stations

are Park Kultury and Oktyabrskaya.

The existing bridge was completed on May 1, 1938, as part of Joseph Stalin's ambitious reconstruction of downtown Moscow. Designed by engineer V. P. Konstantinov and architect A. V. Vlasov, it is the fourth bridge on this site and the only suspension bridge in all of Moscow.

History

The first pontoon Krymsky Bridge was built in wood in 1786. Subsequently, it was rebuilt as a fixed wooden causeway with a 15-metre central span for barges. Both wooden bridges were frequently damaged by ice and floods, and had to be repaired on numerous occasions.

The first steel bridge, built in 1873 by Amand Struve to a design by V.K. Speyer, featured two 64-meter truss boxes, supported by the central pillar. Traffic moved inside the truss, which was congested and unsafe. Tram companies issued a rule that only one tram can be on a bridge at a time, to prevent traffic deadlocks.

During Stalin's reconstruction of Moscow, every bridge in the downtown was either rebuilt or scheduled for demolition. The Crimean Bridge was slated to be replaced in 1935. The old bridge had to operate until the substitute was completed, because the Soviet capital could not afford interruption of service along the Garden Ring. Between 21 May and 26 May

1936, the old bridge was moved fifty meters from its site on temporary pillars. For the first time in Soviet history a 4000-ton, 128-meter structure was relocated successfully. The old bridge was in operation until the new bridge was completed on May 1, 1938.

Modern bridge

The bridge's total length with approach ramps is 668 metres (bridge itself 262.5 metres, spans 47.25 + 168.0 + 47.25 metres). Its full width 38.4 metres, including: a 24 meter road (6 lanes) and two 5-metre pedestrian lanes.

It consumed nearly 10,000 tons of steel, or 1 metric ton per square metre of deck (itself having a very low ratio of area usage, 24 to 38.4).

The bridge deck was replaced in 2001. During repairs, traffic was restricted, but never closed completely.