Скачиваний:
55
Добавлен:
02.05.2014
Размер:
220.74 Кб
Скачать

3 - General model

CEM-97/017

D R A F T

3.2Evaluation process overview

51

The following is a high-level overview of the evaluation process under the CEM.

 

The evaluation process can be divided into three stages which may overlap:

 

a)

preparation - in this stage initial contact is made between the sponsor and

 

 

the evaluator;

 

b)

conduct - in this stage the evaluation is performed;

 

c)

conclusion - in this stage the evaluation results are delivered.

52

The interactions between these roles during each stage of evaluation are described

 

in the following sections.

3.2.1Preparation

53

In the preparation stage (see Figure 3.2), the sponsor approaches the relevant party

 

within the scheme to initiate the evaluation of a PP or a TOE. The sponsor supplies

 

the evaluator with the PP or the ST. The evaluator performs a feasibility analysis to

 

assess the likelihood of a successful evaluation, requesting relevant information

 

from the sponsor. The sponsor or the developer supplies the evaluator with a

 

subset of evaluation deliverables (possibly in draft form). The evaluator may

 

review the PP or the ST and advise the sponsor about changes needed to assure a

 

firm basis for the evaluation. If the scheme requirements for evaluation are

 

satisfied, the evaluation will proceed to the next stage.

54

The feasibility output should include the list of the evaluation deliverables, an

 

ordered list of evaluation activities and information about sampling requirements

 

in the CC will be addressed (e.g. ATE_IND). The feasibility output should be

 

agreed to by all roles. The details of the feasibility output depend on a variety of

 

factors, particularly on whether the evaluation is of a PP or of a TOE. All roles are

 

responsible for identifying and protecting proprietary information.

55

In accordance with the scheme, the sponsor and the evaluator typically sign an

 

agreement during this stage to define the framework of the evaluation. The

 

agreement takes account of constraints imposed by the scheme and of national

 

laws and regulations as applicable.

Page 12 of 24

Version 0.6

97/01/11

CEM-97/017

 

 

3 - General model

 

 

D R A F T

 

 

 

Developer

 

feasibility output agreement

feasibility output agreement

 

 

subset of evaluation deliverables

 

 

PP or ST

 

 

subset of evaluation deliverables

 

 

request for feasibility study information

 

Sponsor

proposed changes to ST or PP

Evaluator

 

feasibility output agreement

 

 

 

agreement

 

feasibility output agreement

feasibility output agreement

 

 

Overseer

 

 

Figure 3.2 - Preparation stage

 

97/01/11

 

Version 0.6

Page 13 of 24

Соседние файлы в папке Зарубежные нормативные документы и критерии на английском