Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:

TPA Dc. 2014 BOOK 3_CLIMATE CHANGE

.pdf
Скачиваний:
19
Добавлен:
16.03.2015
Размер:
15.25 Mб
Скачать

Total’s involment in CCS projects worlwide

81

Book 3 - GHG

A TOTAL Project :

CCS pilot project in Lacq-general objectives.

CO2 capture

 

CO2 transport

CO2 storage

 

and injection

 

 

 

 

 

 

 

1 - Contribute to a potential climate change mitigation technology

2 - A 30 MWth oxycombustion scheme with CCS

3 - A pilot to validate industrial size CCS schemes worldwide 4 – Total cost = 60 M€, entirely funded by Total

82

Book 3 - GHG

Pilot location:

Total Exploration & Production in France

83

Book 3 - GHG

The Lacq plant - South-West of France

84

Book 3 - GHG

Carbon Capture & geological Storage in the Lacq region

85

Book 3 - GHG

CO2 injection into a depleted gas reservoir

 

Book 3 - GHG

86

Installations for CO2 Capture at Lacq

87

Book 3 - GHG

Boiler revamping

Existing boiler revamping with

CO2 recycling

40 t/h ot steam 60bar/450°C

(30 MWth) to HP steam network

 

Oxygène

 

Combustible

?

Fumées d’oxy-combustion

Eau d’alimentation

 

Vapeur produite

 

 

ALSTOM in change of boiler revamping study

Air Liquide developing and providing oxyburners

1MW prototype tested

4 x 8 MWth required

204 t/day oxygen required

88

Ventilateur de

 

recycle des fumées

Cheminée

 

Registre

Traitement des fumées

Ventilateur booster vers traitement de fumées

Book 3 - GHG

Lacq CCS oxycombustion basic process

Combustion using pure oxygene releases flue gas with a high concentration of CO2 and water vapor

The flue gas is purified and dehydrated. The wet CO2 (concentration of 90 to 93%) is compressed at 27 bar then dried for transport (27 km)

The CO2 is then compressed at a pressure of over 40 bar before being reinjected to a depth of 4500 m into the Rousse reservoir

Rousse reservoir has already demonstrated its integrity for several million years

89

Book 3 - GHG

CO2 injection at Lacq: volume and pressure of CO2 Pre-project estimates

90

Book 3 - GHG

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]