Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Part II - Well completion design.pdf
Скачиваний:
98
Добавлен:
25.03.2015
Размер:
5.31 Mб
Скачать

Improving sweep efficiency in a system of injection and production wells

Displacement of oil by water in

heterogeneous reservoir by means Same + application of ICV of horizontal injector and producer

Producer

Producer

Stream

lines

Injector

Injector

Prepared by Alexey Khrulenko, 2010

Part II - Well completion design

Drilling technology – wells with complex trajectories

Example: Multilateral well drilled on the Troll field and placed over the Moscow image…

Ref.: Øivind Rekdal, 2007

Example

 

 

 

•34

 

•Prepared by Alexey Khrulenko, 2011

Part II - Well completion design

Problem setup

 

•вязкость нефти: μo=0,55 сПз;

 

•вязкость воды: μw= 0,3 сПз;

 

•давление насыщения нефти: Psat=245 бар;

 

•газосодержание нефти: R =100 м33

10,65 млн. м3

s

330 бар

 

352.5 бар

25,1 млн. м3

 

 

•Prepared by Alexey Khrulenko, 2011

Geological•Неопределенностьuncertaintyколлекторских свойств

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.2

 

 

.3

 

 

.4

 

 

.5

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

•Prepared by Alexey Khrulenko, 2011

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]