- •Syllabus
- •Well completion design
- •High Technology Wells
- •Production from oil rims
- •Intrawell gas lift
- •Alternating gas production
- •Improving sweep efficiency in a system of injection and production wells
- •Example
- •Problem setup
- •Drainage Strategy
- •Well completion scenario
- •Simulation Results: Cumulative oil production with ICVs and its incremental volumes as compared with ordinary completion wells
- •Discounted effect, ICVs performance
- •Position of ICV in one of the wells
- •Well perforation
- •Sand Control
- •Syllabus
- •Examples of developing materials with improved erosion resistance
Improving sweep efficiency in a system of injection and production wells
Displacement of oil by water in
heterogeneous reservoir by means Same + application of ICV of horizontal injector and producer
Producer |
Producer |
Stream
lines
Injector |
Injector |
Prepared by Alexey Khrulenko, 2010
Part II - Well completion design
Drilling technology – wells with complex trajectories
Example: Multilateral well drilled on the Troll field and placed over the Moscow image…
Ref.: Øivind Rekdal, 2007
Example
|
|
|
•34 |
|
•Prepared by Alexey Khrulenko, 2011 |
Part II - Well completion design |
Problem setup
|
•вязкость нефти: μo=0,55 сПз; |
|
•вязкость воды: μw= 0,3 сПз; |
|
•давление насыщения нефти: Psat=245 бар; |
|
•газосодержание нефти: R =100 м3/м3 |
•10,65 млн. м3 |
s |
•330 бар |
|
|
•352.5 бар |
•25,1 млн. м3 |
|
|
•Prepared by Alexey Khrulenko, 2011 |
•
Geological•Неопределенностьuncertaintyколлекторских свойств
•
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
.•2 |
|
|
.•3 |
|
|
.•4 |
|
|
.•5 |
|
|
|||||
•1 |
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
||||||||||
. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
•Prepared by Alexey Khrulenko, 2011