66.6.1 Case Study Problems

66.6.1.1 - Case 1

OVERVIEW: You have just been hired as a manufacturing engineer by Sports Wares and Equipment Technology (SWET) Inc., a small company. The engineer you are replacing was working on a new product but had to resign for family reasons. On your first day there are a number of desperate problems that have to be examined, and the company is counting on the quality of the answers you provide. To make your life harder, your boss made it quite clear that your reputation is on the line and small mistakes may be very costly.

YOUR ROLE:You are to follow the day of the manufacturing engineer, and interact with others to get the job done right.

THE FACILITIES: As the manufacturing engineer it is your job to direct the setup of equipment for the new product. At present you know about the following machines, and their hourly costs.

lathe ($30/hr) mill ($40/hr)

stock room ($20/hr) cutoff saw ($30/hr) drill ($25/hr)

THE NEW PRODUCT: The product you are working on is a mounting bracket for sports equipment. As can be seen in the figure below the bracket involves a rectangular base plate with one hole, one press fit bushing and one threaded shaft. The drawing is not yet final, and the design engineer needs a couple of answers before he can complete the drawing. In addition, the people in production are asking you questions.

page 473

 

 

 

 

3 7/8”

1/2”

1 15/16”

 

 

1.255”

 

 

1.245”

 

 

 

 

 

 

 

15/16”

1 7/8”

R 1/4”

Dia. 1 1/4”

Bushing FN2 fit 3/4” outside

 

 

1/2” inside

 

 

UNC-

 

32

 

 

 

1.500±0.002”

 

 

1/2”

 

 

MAT’L: Stainless Steel

 

 

Drawing Not To Scale

YOUR DAY:

9:10am Joseph Blough drops by your office and explains he has just been hired in production and is not sure how to read a micrometer. a) He asks you to draw an example of a simple micrometer reading 0.235”. b) He then asks why a bench micrometer has a larger thimble.

9:20am Ian Specter in Quality Control phones you and explains he is ordering metrology equipment and asks you to recommend inspection techniques for a) the overall height tolerance, b) the locational tolerance between the centre of the thread and the bushing, and c) the surface rough-

page 474

ness.

9:35am Ian calls back and says that all of your earlier suggestions were too expensive and asks for alternatives.

9:55 am Pete Rout in engineering calls and asks how the surface finish specified on the drawing impacts production and quality control. You mention it is not very specific and a) suggest a more specific symbol. You also check your old MEC015 notes and see a chart of surface roughness for different manufacturing processes. You use this to b) suggest a more appropriate surface roughness value.

10:20am Anne Nuther drops by your office and seems concerned about the dimensions and tolerances of the bushing and hole in the part. You quickly a) provide the dimensions and tolerances for both.

10:40am Wyoming Knott in maintenance left a message requesting instructions for where to place the machines for the new product. You decide that before you can do the layout you need to determine the required production steps. Luckily you found a partially completed process plan to start with. You decide to a) complete the process plan and b) calculate all required machine settings, times, tools and costs.

page 475

a)

Step #

Description

Machine

Parameters/tools/etc

Time

Cost

 

 

 

 

 

 

0010

get 2x1 3/4” square

none

none

5 min

$1.67

 

bar stock

 

 

 

 

0020

cut to 4” length

cutoff saw

none

5 min

$2.50

0030

mill off to 3 7/8”

mill

 

 

 

0040

mill width to 1 7/8”

 

 

 

 

0050

mill height to 1.5”

 

 

 

 

 

 

 

 

 

 

11:30am Phillip Etup in shipping sends a memo saying that they will be testing the bushings that arrived this morning (it seems that your predecessor ordered ahead). They want to know a) if the n=50, c=1 plan from before will give them an AQL of 1% with a producer’s risk of 5%?

page 476

1:15pm Norman Alguy calls and says that the cutting parameters for step 0030 in the process plan look too high for the 10hp mill. If the mill has a 1/4hp idle power and is 95% efficient, a) is it sufficient for the cuts?

2:20pm Anne drops by again to discuss the cutting conditions in your process plan. When they tried the same type of process on the lathe previously, they got a tool life of 1 hour at 500 fpm and 2 hours at 300 fpm. a) How long should the tool last for the proposed process plan?

2:45pm You are looking over the drawings and decide to b) check the capabilities of the drilling process to see if it can locate the 1.245” to 1.255” tolerance. You pull out the old data for a similar bracket that was produced before, and a) construct an X-bar chart to verify the tolerance.