94 Chapter Five
Bf. = area bias, megawatts per 0.1 Hz Bt= time-error biasAt
=time error, seconds
If scheduled net interchange
To= 200 MW into the system, actual net interchange
Tl= 180 MW into the system, F = 60 Hz,
F1= 59.9 Hz,
В= 150 MW/0.1 Hz, andA£ = 0, then the area control error is
(a)
+
130 MW№) Zero
+ 170 MW
-
130 MW
If frequency bias is set too low, an interconnected power system
will respond to troubles in adjacent systems with
More than its share of bias response
Correct bias response
Less than its share of bias response
If a power system operates at an average frequency of less than 60
Hz:
No time error will accumulate
There will be a slow accumulated time error
There will be a fast accumulated time error
10. A power system operator who observes an accumulated time error
should correct it by
(а) Increasing generation on the system
(б) Reducing generation on the system
(c) Coordinating time-error correction with other interconnected
systems
4-5
*Fuel costs have increased by
a factor of at least 10 since the early 1970s. This has
significantly increased the cost of electric power for all
consumers.
33