Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
FWD / 92FWD_21.PDF
Источник:
Скачиваний:
98
Добавлен:
19.03.2015
Размер:
16.06 Mб
Скачать

Ä

 

TRANSAXLE 21 - 73

 

OUTPUT SHAFT REPAIR

Transfer shaft should be removed for repair of out put shaft. Planetary gear sets must be removed to accurately check output shaft bearing turning torque.

Fig. 1 Remove Output Shaft Retaining Nut and

Fig. 3 Output Shaft Gear and Select Shim

 

Washer

 

Fig. 4 Remove Output Shaft Gear Bearing Cone

Fig. 2 Remove Output Shaft Gear

Fig. 5 Install Output Shaft Gear Bearing Cone

21 - 74 TRANSAXLE

 

Ä

 

Fig. 6 Remove Output Shaft and Rear Annulus Gear

Fig. 9 Install Rear Planetary Annulus Gear Bearing

Assembly

Cone

Fig. 7 Remove Output Shaft

Fig. 10 Install Output Shaft into Rear Planetary

 

Annulus Gear

Fig. 8 Remove Rear Planetary Annulus Gear

 

Bearing Cone

Fig. 11 Remove Output Shaft Gear Bearing Cup

Ä

 

TRANSAXLE 21 - 75

 

 

DETERMINING SHIM THICKNESS

 

Shim thickness need only be determined if any of

 

the following parts are replaced:

 

² Transaxle case

 

² Output shaft

 

² Rear planetary annulus gear

 

² Output shaft gear

 

² Rear annulus and output shaft gear bearing cones

 

² Overrunning clutch race cups.

 

Refer to Bearing Adjustment Procedure at the

 

rear of this section, to determine proper shim thick-

 

ness for correct bearing 8preload' and turning torque.

 

Check output shaft bearings turning torque, us-

 

ing an inch-pound torque wrench. If turning

 

torque is 3 to 8 inch-pounds, the proper shim

 

has been installed.

 

Fig. 12 Remove Rear Planetary Annulus Gear

 

Bearing Cup

Fig. 15 Install Output Shaft Assembly

Fig. 13 Install Output Shaft Gear Bearing Cup

Fig. 16 Output Shaft and Select Shims in Position

Fig. 14 Install Rear Planetary Annulus Gear Bearing

Cup

Соседние файлы в папке FWD