Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Kawasaki Ninja ZX6R 2009_manual.pdf
Скачиваний:
76
Добавлен:
13.02.2016
Размер:
15.98 Mб
Скачать

7-20 ENGINE LUBRICATION SYSTEM

Oil Pressure Switch

Oil Pressure Switch Removal

Remove:

Right Lower Fairing (see Lower Fairing Removal in the Frame chapter)

Engine Oil (Drain, see Engine Oil Change in the Periodic Maintenance chapter)

Switch Cover [A] Switch Terminal Bolt [B] Oil Pressure Switch [C]

Oil Pressure Switch Installation

Apply silicone sealant to the threads of the oil pressure switch, and tighten it.

Sealant - Kawasaki Bond (Silicone Sealant): 56019-120

Torque - Oil Pressure Switch: 15 N·m (1.5 kgf·m, 11 ft·lb)

Install the switch lead [A] as shown in the figure. Front View [B]

Apply grease to the terminal.

Tighten the terminal bolt.

Torque - Oil Pressure Switch Terminal Bolt: 1.5 N·m (0.15 kgf·m, 13 in·lb)

Cover the switch.

Install the right lower fairing (see Lower Fairing Installation in the Frame chapter).

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]