Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Kawasaki Ninja ZX6R 2009_manual.pdf
Скачиваний:
76
Добавлен:
13.02.2016
Размер:
15.98 Mб
Скачать

15-20 FRAME

Fenders

Front Fender Removal

Remove:

Clamps [A] (Both Sides)

Bolts [B] with Washers (Both Sides)

Reflectors [C] (Both Sides, US, CA, CAL and SEA Models)

Front Fender [D]

Front Fender Installation

Tighten:

Torque - Front Fender Mounting Bolts: 3.9 N·m (0.40 kgf·m, 35 in·lb)

Flap and Rear Fender Removal

Remove:

Flap (see Seat Cover Removal)

Rear Seat Cover (see Seat Cover Removal) Owner’s Tool

Bolts [A]

Tool Kit Case [B]

Remove:

Battery [A] (see Battery Removal in the Electrical System chapter)

Exhaust Butterfly Valve Actuator [B] (see Exhaust Butterfly Valve Actuator Removal in the Fuel System (DFI) chapter)

Fuse Box [C]

Relay Box [D] (see Relay Box Removal in the Electrical System chapter)

Turn Signal Relay [E] (see Turn Signal Relay Inspection in the Electrical System chapter)

ECU [F] (see ECU Removal in the Fuel System (DFI) chapter)

Fuel Tank (see Fuel Tank Removal in the Fuel System (DFI) chapter)

Remove: Bolts [A]

Rear Fender [B]

FRAME 15-21

Fenders

Flap and Rear Fender Installation

Installation is the reverse of removal, note the following. Check that the pad [A] is in place on the rear fender [B].

5 mm (0.20 in.) [C]

Run the harness, cables and leads correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter).

Apply a non-permanent locking agent to the threads of the tool kit case bolts.

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]