Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Kawasaki Ninja ZX6R 2009_manual.pdf
Скачиваний:
76
Добавлен:
13.02.2016
Размер:
15.98 Mб
Скачать

11-6 FINAL DRIVE

Drive Chain

Drive Chain Slack Inspection

Refer to the Drive Chain Slack Inspection in the Periodic Maintenance chapter.

Drive Chain Slack Adjustment

Refer to the Drive Chain Slack Adjustment in the Periodic Maintenance chapter.

Wheel Alignment Inspection/Adjustment

Refer to the Wheel Alignment Inspection in the Periodic Maintenance chapter.

Drive Chain Wear Inspection

Refer to the Drive Chain Wear Inspection in the Periodic Maintenance chapter.

Drive Chain Lubrication

Refer to the Drive Chain Lubrication Condition Inspection in the Periodic Maintenance chapter.

Drive Chain Guide Wear Inspection

Refer to the Chain Guide Wear Inspection in the Periodic Maintenance chapter.

Drive Chain Removal

NOTE

Since the drive chain is installed through the swingarm, The chain can not be removed other than by cutting it. Prepare the new link pin, link plate, grease seals, and tools for rejoining the chain.

Remove: Bolts [A]

Front Footpeg Bracket [B]

Remove: Bolts [A]

Quick Rivet [B]

Chain Cover [C]

Push the central pin, and then remove the quick rivet.

CAUTION

For safety, if the drive chain shall be replaced, replace it using a recommended tool.

Recommended Tool - Type: EK Joint Tool #50

Brand: ENUMA

FINAL DRIVE 11-7

Drive Chain

Body [A]

Handlebar [B]

Cutting and Riveting Pin [C]

For Cutting [D]

For Riveting [E]

Plate Holder (A) [F]

Plate Holder (B) [G]

Gauge [H]

Grind [A] the pin head to make it flat.

Set the cutting and riveting pin [B] as shown in the figure.

Screw the pin holder until it touches the link pin.

Be sure that the cutting pin hits center of the link pin.

Screw the handlebar [A] into the body.

Turn the pin holder with the wrench [B] clockwise to extract the link pin.

Replace the link pin, link plate and grease seals.

Apply grease to the link pins [A] and grease seals [B] [C].

Engage the drive chain on the engine and rear sprockets.

Insert the link pins in the drive chain ends.

Install the grease seals.

Install the link plate so that the mark [D] faces out.

Push the link plate by hand or plier to fix it.

In case of grease seals chain, be sure to set the grease seals correctly.

11-8 FINAL DRIVE

Drive Chain

Set the plate holder (A) [A] and plate holder (B) [B] on the body.

Fit the plate holder (A) to the link plate.

Turn the pin holder by hand until the plate holder (B) touches the other link plate.

Turn the pin holder by a wrench clockwise until two pins of link come into groove of the plate holder (A).

Take off the plate holder.

Set the plate holder (B) [A] and cutting and riveting pin [B] as shown in the figure.

Turn the pin holder until the riveting pin touches the link pin.

FINAL DRIVE 11-9

Drive Chain

Turn the wrench clockwise until the tip of riveting pin hits of the link pin.

Rivet it.

Same work for the other link pin.

After staking, check the staked area of the link pin for cracks.

Measure the outside diameter [A] of the link pin and link plates width [B].

Link Pin Outside Diameter

Standard: 5.7 6.0 mm (0.22 0.24 in.)

Link Plates Outside Width

Standard: 17.25 17.45 mm (0.679 0.687 in.)

If the reading exceeds the specified length, cut and rejoin the chain again.

Check:

Movement of the Rollers

Adjust the drive chain slack after installing the chain (see Drive Chain Slack Adjustment in the Periodic Maintenance chapter).

When installing the chain cover [A], note the following. Apply a non-permanent locking agent to the bolt [B] only.

Install the front footpeg bracket.

Tighten:

Torque - Front Footpeg Bracket Bolts: 25 N·m (2.5 kgf·m, 18 ft·lb)

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]