2. Look through the texts again and find English equivalents for the following Ukrainian ones:

корисний об’єм, водосховище, додаткові витрати, річне виробництво електроенергії, водозливна гребля, шлюз, розподільний пристрій, земляна гребля, напірний фронт, автотрансформатор, підстанція, автомагістраль, затоплення, сільськогосподарські угіддя, заплавина, русло річки, нижній б’єф, лінія електропередач.

3. Brainstorming. In small groups of 3 or 4 students discuss formulated answers to the questions. Text 13.

1. Read the texts below and select the terms connected with hydroenergetics.

Dniepro hps

1. Dniepro hydroelectric power station is constructed below the edge part of the river near Zaporizhzhia city. The length of pressure front equals 1,2 km. The following unites belong to the buildings of the waterworks facility, namely: a building of the HPS-1, a building of the HPS-2, shield wall, concrete overflow and non-overflow dams, single-lift and 3-lift navigation locks, 154 kV open distribution device. There is a motorway along the bridge through overflow dam and overpass above locks.

2. The concrete overflow dam with 760 meters length is executed in the plan as a curved dam with 600 m radius.

3. The building of the HPS-1 is located on the right bank of the Dniepro River; the building of the HPS-2 – on the left bank at 30 m distance from the lower edge of the overflow dam.

4. Hydroelectricity of Dniepro HPS-1 is transferred to 154 kV switching substation. 154 kV substation through autotransformer is connected with 330 kV switching substation.

Dniepro HPS-2 transfers its electricity by 154 kV two transmission lines.

Kakhovka hps

1. Kakhovka HPS is the sixth lower step of Dniepro cascade of HPS and situated near Nova-Kakhovka town.

2. The following units belong to the waterworks facility, namely: a building of the HPS, 154 kV closed distribution device, overflow concrete dam, embankment dam and lock.

3. There are railway and motorway along hydraulic structures. Kakhovka water storage reservoir is the biggest on the Dnipro River. Its total storage capacity equals 18,2 km3.

The length of the control structure is 3,8 km.

4. The following irrigation canals start from Kakhovka water storage reservoir, namely: Kakhovka, North-Crimea, Dniepro-Kryviy Rig and others.

5. The connection layouts are block (generator-transformer with one 2-sectional work and one 154 kV transfer bus bar.

Each block is connected to one of the sections of bus bar through 154 kV breakers.

2. Read jumbled parts of Ukrainian translation and arrange them in a logical order: Дніпровська гес

Електроенергія ДГЕС-1 передається на підстанцію 154 кВ. Під­станція 154 кВ через автотрансформатор з'єднана з підстанцією 330 кВ. ДГЕС-2 передає свою електроенергію двома лініями елек­тропередачі 154 кВ.

Бетонна водозливна гребля довжиною 760 м виконана в плані криволінійної лінії з радіусом 600 м.

Дніпровська ГЕС, споруджена нижче порожистої частини річки біля м. Запоріжжя. Довжина напірного фронту – 1,2 км. До складу споруд гідровузла входять: будинок ГЕС-1, будинок ГЕС-2, щи­това стінка, бетонна водозливна і глуха греблі, однокамерний та трикамерний суднохідні шлюзи, відкритий розподільчий пристрій 154 кВ. По мосту через водозливну греблю та естакаду над шлюзами проходить автомобільний шлях.

Будівля ГЕС-1 розташована на правому березі Дніпра, ГЕС-2 – на лівому березі на відстані 30 м від низової грані водо­зливної греблі.